PETROJET has executed the whole of the Egyptian grid of trunk pipelines for all services (oil, gas and products) with track record exceeding 30,000 Km.

Also, PETROJET has executed large pipeline projects in Libya, Jordan, UAE, Qatar, Algeria and Saudi Arabia.

PETROJET is an active member of the International pipeline & Offshore Contractors Association (IPLOCA(

As a related service PETROJET provides the following types of pipe Coating through its 3 dedicated pipe coating plants:

  • Anti-Corrosion External Coating (Polyethylene – Polypropylene – Fusion Bonded Epoxy).
  • B- Epoxy Anti Corrosion Internal coating.
  • C- Concrete coating.
  • D- Heat Insulation External coating (Polyurethane).

SCOPE OF WORK

  • Project Management.
  • Basic and Detailed Engineering.
  • Procurement & Procurement Services.
  • Pipe Coating.
  • Construction
  • Testing
  • Valve stations.
  • Pig launching & Receiving traps.
  • Boosting & Compression stations.
  • Commissioning assistance.

YAMAMA Cement Plant (Gas & crude oil) Pipeline Project


Construction of Civil , Mechanical , Electrical and instrumentation works for  ( Gas Pipeline  &  Crude Oil  pipeline )

Country : Saudi Arabia
Client : GAS Arabian Co & YAMAMA Cement Co

Nuayyim fields pipelines


Engineering, Procurement, and Construction for Onshore Gas, water and oil Pipelines

Country : Saudi Arabia
Client : Aramco

Manifa Up stream pipelines


Engineering, Procurement & construction for Crude Oil Pipeline 

Country : Saudi Arabia
Client : Aramco

KHOUR El ZUBAIR – NASSRIYAH LPG Pipeline


Execution of Khour El Zubair – Nassriyah Gas Pipeline with a diameter 16″ from Khour El Zubair in BASRAH to Nassriyah Pump Station with total length 200 Km.

Country : Iraq
Client : Oil Pipeline Company (OPC)

Duqm Pipeline (36” 221 Km)


Engineering, Procurement and Construction of 36”- 221 Km Pipeline from Saih Nihayda to Duqm Economic Zone

Country : Oman
Client : Oman Gas Company (OGC)

GGP Export Pipeline & Fahud West Loop Line (12”- 46 Km and 30”- 56 Km)


  Full Construction scope of 2 pipelines in the middle of Sultanate of Oman, as follow: Fahud Pipeline12”- 46 Km GGP Pipeline    30”- 56 Km

Country : Oman
Client : Petroleum Development Oman

Ain Sokhna /wadi hagool/Al-Hafayer Crude Oil (30”-42 km)


Pipe coating works, and Civil, Mechanical, and Electrical works for Ain Sokhna/wadi hagool/ Al-Hafayer (30”-42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room

Country : Egypt
Client : Petroleum Pipelines Co. PPC

Al-Gamil/Damietta (42”-50 km)


Engineering, Procurement and Construction of 42”-50 km Pipeline including 23 HDD crossings to connect Al-Gamil valve rooms to New Damietta electric station

Country : Egypt
Client : GASCO

Ta’iz Water Supply & Sanitation


The Project aims at the Rehabilitation of Water Networks west of the city of Ta’iz with a length of 392Km. and Rehabilitation & Extension of Sewerage System east of the city of Ta’iz with a length …

Country : Yemen
Client : Ministry of Environment and Water

DISI Amman Mudawara Water Conveyance System


Transferring water extracted from the Ram Aquifer via a buried pipeline from the Disi area in the South to the city of Amman, 325 km north.

Country : Jordan
Client : Gama - (Jordanian Ministry of Water and Irrigation / DIWACO)

Haoud El Hamra-Skikda (NK1) (30” – 650Km)


Execution of the two Crude Oil Pipeline Lots from Haoud El Hamra at Hasi Masoud Area to Biskra and From Biskra to Skikda at the Mediterranean Sea with a total length of 650 Km to transport 1.5 Million …

Country : Algeria
Client : Sonatrach TRC

SHARARA / MELLITAH (725 Km – 30″)


A development aiming to increase the export capacity of the Elephant Oil Field on Block NC in the Murzuk Basin operated by Agip to 150,000 b/d. expandable to 400,000 b/d. The development involves layi …

Country : Libya
Client : Eni Oil Libya

Arab Gas Pipeline (Stage II) Jordanian Gas Transmission Pipeline (393 Km – 36″)


This stage of the project covers the construction of 36”, 393 Km, polyethylene coated gas pipeline. The pipeline extends from Aqaba in the south of Jordan to the Samara and Rehab power stations in the …

Country : Jordan
Client : Jordanian Egyptian Fajr for Natural Gas Transmission & Supplies Ltd. (FAJR)

UPPER EGYPT GAS PIPELINE PROJECT


Execution of a Gas Pipeline from Dahshour to Aswan as part of the National Plan for developing Upper Egypt. The pipeline was executed over a number of segments starting from Kuraimat up to Aswan passi …

Country : Egypt
Client : Egyptian Natural Gas Co.GASCO

Greater NEEM Crude Oil Pipeline


An EPC Contract awarded to the consortium of PETOJET & RAM Energy for the construction of a 16”- 100 Km Crude Oil Pipeline to transport dehydrated crude oil from NEEM to Diffra Field production Fa …

Country : Sudan
Client : Greater Nile Petroleum Operating Company

Certified: ISO 9001- ISO 14001
OHSAS 18001 - ISO 17025
ASME Stamps - API Q1 - Hull Structures