Petrojet

Al Khafji Field Development Phase I

Petrojet carried out installation of new 6 platforms, modifications in 5 existing platforms, new sub sea pipeline with total length of 110 km sizes 28” / 36” / 42” and laying of sub sea cables with total length of 8 km diameter 6” Located at the Joint operations area – North of Arabia Gulf.

Project is executed by consortium of PETROJET / ENPPI / PMS / RAWABI

 

HA’PY Platform

Platform Details:

Weight               : 3618 Ton

Water Depth      : 80 m

Scope of Works:

Fabrication, Load Out and Sea-Fastening.

Simian Platform

Weight             :  2163 Ton

Water Depth    :  61 m

Scope of Works:

Fabrication, Load Out and Sea-Fastening.

AL-AMAL PLATFORM

Platform Details:

Weight                    :  1055  Ton

Water Depth           :         25      M

 Scope of Works:

Design, Procurement, Fabrication, Load Out and Sea-Fastening.

Zohr control platform

Platform Details

weight               : 5025 Ton

Water Depth      :  90 m

Project scope of work

Fabrication, Load out & sea-fastening

Certified: ISO 9001- ISO 14001
OHSAS 18001 - ISO 17025
ASME Stamps - API Q1 - Hull Structures