Petrojet

Nooros-Abu Madi-El Gamil Pipeline

Execution of a Gas Trunk  Pipeline with total length of 126 km from Nooros to El Gamil passing by Abu Madi Plant in order to increase the extraction of butane and gas supply to UGDC Company’s plant for increasing Propane production.

1st Pipeline with Diameter 24” and Length 35 km from Nooros Fields Area to Abu Madi Plant.

2nd Pipeline With Diameter 32” and Length 91 km from Abu Madi Plant to El Gamil Plant.

Scope of work includes:

  • Polyethylene and Concrete Coating for Pipeline Pipes.
  • Permitting/Land compensation.
  • Backfilling of Manzala Lake for about 2.2 Million m3 of soil.
  • 7 new Valve rooms (1 inside Manzala lake)
  • Receiving facilities in Abu Madi and El Gamil plant
  • About 57 HDD Crossings and 50 Open Cut Crossings.

Project Challenges

  • El Manzala Lake Backfilling: 200.000 m3 (35 Km Length).
  • 55 HDD Crossings ( River Nile, El Salam Canal, Fish Farms, Railway, Highways, …etc)

YAMAMA Cement Plant Gas & crude oil Pipeline Project

Construction of Civil, Mechanical, Electrical and instrumentation works for 20” diameter Gas Pipeline with 20 km & 8” Crude Oil pipeline with 20 km in additional to Scrapers (Launchers & Receivers), Hot Tapping gas pipeline,  (4) HDD, (12) Valve Stations and supply, installation and finishing of (3) control buildings

Nuayyiem field Pipelines

Engineering, Procurement, and Construction for Gas Pipeline, Crude Pipelines & Water Injection Pipelines with a total length of 208 km and different diameters.

  • 16 in Gas P/L 140 Km
  • 20 in Water P/L 42 Km
  • 12 in Water P/L  7 Km
  • 12 in Water P/L 1.5 Km
  • 20 in Water P/L 1.5 Km
  • 6  In Water P/L 3 Km
  • 8 In Water P/L 10.7 Km
  • 18 In Crude Oil P/L 1  Km
  • 20 In Crude Oil P/L 1.3 Km

Manifa Up stream pipelines

EPC of Crude oil pipelines with  24 “ and  total length of 60 Km with a capacity of 900,000 bbl/day in addition to 90 Km water injection pipelines.

  • 24 ” crude P/L 60 Km
  •  20″, 16″ &  10″  water injection P/L 92 Km
  • 20 Scrapers (Launchers & Receivers)
  •  Interface & Tie-Ins with 17 Drilling Sites

Certified: ISO 9001- ISO 14001
OHSAS 18001 - ISO 17025
ASME Stamps - API Q1 - Hull Structures