Petrojet

Yanbu Export Refinery

Execution of all civil & mechanical works for 33 cylindrical tanks and 13 spherical tanks including Interconnections between them, in addition to installation of (6) cylindrical tanks at yanbu SP1

Lower Fars Heavy oil Development (LFHOD)

Engineering, Procurement, Construction, commissioning & start-up of (26) vertical Tanks

Lately, PETROJET lifted the roof structure of the first tank with the height of 5 meters using the Hydraulic jacking method which is the first of its kind for PETROJET to use in tanks erection.

 

FUEL & WATER STORAGE TANKS

Engineering, Procurement and Erection of (5) Storage Tanks 25,000 m3 to increase the Storage Capacity at El-Gaya Power Station at South Beirut

Certified: ISO 9001- ISO 14001
OHSAS 18001 - ISO 17025
ASME Stamps - API Q1 - Hull Structures