Petrojet

Workshops

PETROJET owns (4) workshops in Egypt and one in Iraq with total area of 175,840 m2. The five workshops are approved for ASME stamps (U, U2, PP-Stamp and S-Stamp) as well as the R-Stamp from the National Board of Boilers & Pressure Vessels and in addition to the API Monogram.

(3) of them work in steel structure fabrication with total production capacity of 3,640 ton per month. Engineering activities are assisted with the latest versions of engineering software such as Autocad, Tekla, STAAD.Pro and Sap 2000.

The workshops have been upgraded in 2016 with a total cost of 100 million EGP to meet with the demanding projects requirements.

Lately, in January 2017 we were the first manufacturer in Egypt and the second in Africa to be certified for ASME Nuclear (N, NPT, NS, NA) stamps.

PETROJET owns its Central Workshop at Kattamia – Cairo for the Fabrication of Static Equipment needed for Petroleum, Petrochemical & Industrial projects. The total fabrication area is 32000 m2.

The workshop is equipped with state-of-the-art fabrication machines, tools and facilities.

Location: https:/goo.gl/maps/qCa17ivH79z

location: Suez

Area: 60000 m2

Production ton/month:  1400

The workshops are equipped with the most advanced machinery and equipment. Engineering activities are

assisted with the latest versions of engineering software such as Autocad, STAAD.pro, Sap 2000,and Tekla

Location: https:/goo.gl/maps/gdVHRtGS6zx

location: IDKU

Area: 57000 m2

Production ton/month: 1400

The workshops are equipped with the most advanced machinery and equipment. Engineering activities are

assisted with the latest versions of engineering software such as Autocad, STAAD.pro, Sap 2000,and Tekla

Location: http:/goo.gl/maps/qvUqfhWCPoG2

PETROJET Has established new fabrication facilities in North – Rumaila in its permanent Camp in Basra to deliver its fabrication solutions to the Iraqi market as well as the nearby market in the Arabian Peninsula and Caspian area.

PETROJET Camps Facilities accommodates currently about 1,600 people and could be increased to serve ongoing projects in Iraq and all these facilities are built on a land area of 250,000 m2  located in North Rumaila.

Workshops were officially inaugurated on 5th of February, 2016 during BASRA 6th Oil & Gas Exhibition in presence of Most of IRAQI Governmental and Major IOCs representatives.

PETROJET NORTH RUMAILA Workshops composed of Main four workshops with total area of (13200m2) all of them have ISO 9001, ISO 14001, OHSAS 18001 in addition to ASME Stamps (U, PP, U2, S).

PETROJET NORTH RUMAILA Workshops have design and manufacture capacity of process equipment at a rate of 300 tons / month and steel structure at a rate of 600 tons / month legged offshore platforms, warehouses and networks of lines and welding pipes at a rate of 15,000 inches a Country / month in addition to the works of maintenance, repair and has been inaugurated officially on the sidelines of the Basra International Fair sixth oil in the presence of a high level delegation of the characters Iraqi oil Ministry and companies.

Total area: 50,000 m2

Location: Duqm industrial area, 650 km from Musqat, sultanate Oman

Duqm is new industrial, commercial area, including Duqm port

Current status: Now in finalizing permits from authorities

location: SOUTH ALEXANDRIA

Area: 10000 m2

Production ton/month:  840

The workshops are equipped with the most advanced machinery and equipment. Engineering activities are

aided with the latest versions of engineering software such as Autocad, STAAD.pro, Sap 2000,and Tekla

Location: https:/goo.gl/maps/yVvqyYfoFzk

Petrojet owns and operates an automatic pipe spools fabrication workshop for fabrication of piping spools for oil, gas, petrochemical, power & industrial projects.
Location: Port said (200km north east of Cairo)
Area: 3024 m2
Production capacity: 900-1200 d.i./day (1 shift) for c.s, a.s, s.s, etc.

The workshop has 3 production lines for standard and heavy wall thickness pipes of c.s, a.s, s.s etc:

  • 2” to 24” line (with cutting band saw and pipe end beveling machine).
  • 32” to 36” line (with roller-bench-type pipe plasma cutting).
  • 26” to 48” line (with cutting band saw and pipe end beveling machine).

The Pipe fabrication production lines consist of:

  • (1) Set of roller-bench-type pipe plasma cutting, (2) sets of high speed pipe cutting band saw machine + (2) sets of fixed-type pipe end beveling machine.
  • (8) Sets of piping prefabrication fast fitting-up machine, sixteen (16) sets of piping automatic welding machine.
  • Automatic conveying system and a set of steel structure pipe racks.

The pipe fabrication production line offers excellent production efficiency – hoisting with overhead traveling crane, beveling with high speed cutting and beveling machine and welding with automatic welding machine.

Certified: ISO 9001- ISO 14001
OHSAS 18001 - ISO 17025
ASME Stamps - API Q1 - Hull Structures