Petrojet

Iraq starts production from Siba Gas field

Iraq Petroleum minister inaugurated Siba Gas field in 25th of April, where the Southern field has achieved an initial production of 25 million standard cubic feet.

Engineering, Procurement, Construction, Pre-commissioning, Testing and Start-up of the central processing facility (CPF) in Siba contract area facilities Kuwait Energy and Basra Oil company

Certified: ISO 9001- ISO 14001
OHSAS 18001 - ISO 17025
ASME Stamps - API Q1 - Hull Structures