SUMED EXPANSION OF SUMED STORAGE CAPACITY – PHASE IIII
ProjectDetails

Construction of 6 Cylindrical Tanks with a total capacity of 175,000 m3, associated with Civil, Piping & Electrical works at Ain Sokhna Terminal

ProjectTypeTank Farms
ProjectCountryEgypt
ProjectLocationAin Sokhna – Egypt
ProjectClientArab Petroleum Pipeline Co. (SUMED)
SimilarProjects

LOWER FARS HEAVY OIL DEVELOPMENT (LFHOD)

North of Kuwait

Kuwait Oil Company (KOC)-Heisco

LOWER FARS HEAVY OIL DEVELOPMENT (LFHOD)

Engineering, Procurement, Construction, commissioning & start-up of (26) vertical Tanks PETROJET lifted the first tank with the height of 5 meters using the Hydraulic jacking method which is the first of its kind for PETROJET to use in tanks' erection.

Crude oil depots

General Petroleum Corporation

Crude oil depots

Engineering, Construction and Procurement of (29) crude oil storage tanks with a total capacity of 175,000 m3 for each storaage tank and a diameter of 110 m in areas: Ras Badran (12 tanks) Agrood (6 tanks) shoukair (5 tanks) Ras Gharib (6 tanks)

SUMED EXPANSION OF SUMED STORAGE CAPACITY – PHASE IIII

Ain Sokhna – Egypt

Arab Petroleum Pipeline Co. (SUMED)

SUMED EXPANSION OF SUMED STORAGE CAPACITY – PHASE IIII

Construction of 6 Cylindrical Tanks with a total capacity of 175,000 m3, associated with Civil, Piping & Electrical works at Ain Sokhna Terminal