SUMED EXPANSION OF SUMED STORAGE CAPACITY – PHASE III
ProjectDetails

Engineering, Procurement (Except Plates) & Construction of (3) Storage Tanks (120,000 m3 / tank) to increase the Storage capacity for SUMED Co. at Sidi Krir.

ProjectTypeTank Farms
ProjectCountryEgypt
ProjectLocationAlexandria
ProjectClientArab Petroleum Pipeline Co. (SUMED
SimilarProjects

Sonker Terminal Set up

Ain Sokhna

Sonker

Sonker Terminal Set up

EPC of civil, mechanical and electrical works for 3 GAS OIL Storage tanks, 2 capacity of 40,000 m3 + 1 capacity of 20,000 m3 and 3 LPG Tanks of capacity 50,000 m3. The works includes of Steel structures, pipes and pipeline works

Crude oil depots

General Petroleum Corporation

Crude oil depots

Engineering, Construction and Procurement of (29) crude oil storage tanks with a total capacity of 175,000 m3 for each storaage tank and a diameter of 110 m in areas: Ras Badran (12 tanks) Agrood (6 tanks) shoukair (5 tanks) Ras Gharib (6 tanks)

SUMED EXPANSION OF SUMED STORAGE CAPACITY – PHASE IIII

Ain Sokhna – Egypt

Arab Petroleum Pipeline Co. (SUMED)

SUMED EXPANSION OF SUMED STORAGE CAPACITY – PHASE IIII

Construction of 6 Cylindrical Tanks with a total capacity of 175,000 m3, associated with Civil, Piping & Electrical works at Ain Sokhna Terminal