Gouna Port Quay wall Rehabilitation
EPC of rehabilitation works for quay walls no. 1,2,3,4 and 5 with total length of 875m and with 12m depth, including civil and electromechanical works.
One of the Suez Canal Corridor Development projects and the East portsaid harbor expansion. Engineering, procurement and construction of a Berth with a total length of 500 M.
Alexandria
Alexandria Petroleum Company
EPC of rehabilitation works for quay walls no. 1,2,3,4 and 5 with total length of 875m and with 12m depth, including civil and electromechanical works.
Adabiya Port – Egypt
General Authority for the Suez Canal -SCZone
Construction of Dry Cast Plant inside Al Adabiya port in Suez in two phases on the western coast of Suez Gulf, and it is 17 km away from Suez City.
Ismailia – Egypt
Engineering Authority for Armed Forces
A major Egyptian national development project started on August 2014, with the aim of maximizing the role of Suez Canal region as an integrated industrial and economic logistic hub, which will contribute in boosting Egypt’s economic growth. Petrojet scope of work includes: Engineering, Procurement and Construction for 2 motorway tunnels (twin tunnels) under Suez Canal north of Ismailia Road tunnels length (TBM) : 5.82 Km – Open Cut: 1.3 Km Internal Diameter: 11.4 m External Diameter: 12.6 m Distance between tunnels : 12.6 m Concrete wall thickness: 60 cm tunnel clear height: 5.5 m lanes number : 2 lanes/each lane width: 3.65 m Tunnel Slope: 3.3% Deepest point of the tunnel 53 m from sea level and 70 m from land level In addition to Execution of (4) Ventilation and Inspection Shafts each of: (internal Dia 23 m – Depth:80 m).