ZOHR GAS FIELD DEVELOPMENT
ProjectDetails

Construction of onshore gas plant on an area of 2.5 million m2 on 2 phases The first Phase includes inlet facilities, EPF, 4 production Trains, 2 SRUs, Utilities and Flair. It has been completed with gas production capacity that reached 2 BCFD. In parallel and during Completion of the first phase, Petrojet have started construction works in second phase that includes additional 3 production Trains, 2 SRUs, Utilities and Flair. phase 2 aims to increase gas production to more than 2.8 BCFD On the other hand, Petrojet carries out the fabrication of offshore structures for Zohr offshore field that is located 200 km off the onshore plant in the Mediterranean sea operations and at a depth of 1,500 meters. The fabrication works includes fabrication of control platform & deep water structures in addition to coating of 707 km Subsea pipelines with polyethylene and concrete. The Field has a total potenial of about 30 TCF in place.

ProjectTypeGas Processing Plant
ProjectCountryEgypt
ProjectLocationPort Said
ProjectClientPETROBEL / ENI
SimilarProjects

EL MERK OIL FIELD DEVELOPMENT CENTRAL PROCESSING FACILITY PACKAGE

Algeria

Groupement Berkine (JV of Sonatrach and Anadarko)

EL MERK OIL FIELD DEVELOPMENT CENTRAL PROCESSING FACILITY PACKAGE

The El Merk Project aims at establishing the surface facilities required for the exploitation of hydrocarbon liquid reserves of six reservoirs in Blocks 208, 405a and 212 in Algeria. The project comprises building a 98,000 bpd central processing facility including a 29,000 bpd condensate unit, a 31,000 bpd LPG unit and a 600 MMCFD NGL train Constructed of a 500 MMCF Of residue and re-injection gas compression and approximately 80,000 bpd of produced water treatment and re-injection facilities.

DEVELOPMENT OF PHENOL EXTRACTION UNIT

Egypt

Al- Amreya Petroleum Refining Co.(APRC)

DEVELOPMENT OF PHENOL EXTRACTION UNIT

Developing phenol unit extraction to be replaced by N.M.B for saving environment, and increasing production capacity to 283 KT/year

BURULLUS FACILITIES FOR GAS PROCESSING PLANT (TAURUS/LIBRA)

Egypt

Bp

BURULLUS FACILITIES FOR GAS PROCESSING PLANT (TAURUS/LIBRA)

Rehabilitation of Burulus facilities for gas processing plant of Taurus/Libra wells which have the capacity of processing 600 MMCFD