DEVELOPMENT OF PHENOL EXTRACTION UNIT
Developing phenol unit extraction to be replaced by N.M.B for saving environment, and increasing production capacity to 283 KT/year
Petrojet scope of work includes all Civil & Mechanical Works of both the UTILITIES/OFFSITE and ISBL, including procurement, design, fabrication, inspection, construction, installation, erection, testing, pre-commissioning activities and assistance during commissioning and start up
Egypt
Al- Amreya Petroleum Refining Co.(APRC)
Developing phenol unit extraction to be replaced by N.M.B for saving environment, and increasing production capacity to 283 KT/year
Port Said
Pharaonic Petroleum Co. (PhPC)
Development of ATOLL field that aims to increase production capacity to 380 mmscfd of natural gas. Petrojet scope of work includes Civil, Mechanical, E & I works. it also includes EPC for 2 pressure vessels, rehabilitaion for existing low temperature separator, & fabrication of deep water structures with total weight of 840 tons
Idku
Bechtel - (Egyptian Liquefied Natural Gas Co. (ELN
A two – train Liquefied Natural Gas (LNG) plant each with a capacity of approximately 3.6 MT/Y on approximately 165 hectares of land located 3 km from the town of Idku and 40 km East of Alexandria on the Egyptian Mediterranean coast. Technology utilized is the Phillips Optimized Cascade liquefaction technology. The Facility includes 2 Cryogenic Tanks each with a capacity of 140,000 m3, Common Facilities (including Power Generation, Fire Water Systems and Control Building) and Marine Facilities.