AIN SOKHNA /WADI HAGOOL/AL-HAFAYER CRUDE OIL (30”- 42 KM)
ProjectDetails

Pipe coating works, and civil, mechanical, and electrical works for Ain Sokhna/Wadi hagool/ Al-Hafayer (30”- 42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room

ProjectTypeCrude oil Pipeline
ProjectCountryEgypt
ProjectLocation
ProjectClientPetroleum Pipelines Co. PPC
SimilarProjects

El Tina-new capital  (42”-165 KM)

New Capital

Egyptian Natural Gas Co. (GASCO)

El Tina-new capital (42”-165 KM)

Construction of 42”-165 km pipeline split into 2 phases; 1st phase is from El-Tina to Abu Sultan with a length of 92 km including 23 HDD crossings. 2nd phase is from Abu Sultan to the Hot Tap of Dahshour P/L at the New Capital with a length of 73 km including 11 HDD crossings.

NOOROS-ABU MADI-EL GAMIL PIPELINE

From Nooros to Abu MAdi to El Gamil - Egypt

PETROBEL

NOOROS-ABU MADI-EL GAMIL PIPELINE

Execution of a Gas Trunk Pipeline with total length of 126 km from Nooros to El Gamil passing by Abu Madi Plant in order to increase the extraction of butane and gas supply to UGDC Company’s plant for increasing Propane production. 1st Pipeline with Diameter 24” and Length 35 km from Nooros Fields Area to Abu Madi Plant. 2nd Pipeline With Diameter 32” and Length 91 km from Abu Madi Plant to El Gamil Plant. Scope of work includes: Polyethylene and Concrete Coating for Pipeline Pipes. Permitting/Land compensation. Backfilling of Manzala Lake for about 2.2 Million m3 of soil. 7 new Valve rooms (1 inside Manzala lake) Receiving facilities in Abu Madi and El Gamil plant About 57 HDD Crossings and 50 Open Cut Crossings. Project Challenges El Manzala Lake Backfilling: 200.000 m3 (35 Km Length). 55 HDD Crossings ( River Nile, El Salam Canal, Fish Farms, Railway, Highways, …etc)

GGP EXPORT PIPELINE & FAHUD WEST LOOP LINE (12”- 46 KM AND 30”- 56 KM)

Sultanate of Oman

Petroleum Development Oman

GGP EXPORT PIPELINE & FAHUD WEST LOOP LINE (12”- 46 KM AND 30”- 56 KM)

Full Construction scope of 2 pipelines in the middle of Sultanate of Oman, as follow: Fahud Pipeline12”- 46 Km GGP Pipeline 30”- 56 Km