PETROSALAM PLATFORM
ProjectDetails

The project is Consortium between ENPPI And PETROJET Engineering, procurement, fabrication, Pre-commissioning, and Commissioning assistant for Offshore Production Unit with Drilling offshore Jack Up Rig

ProjectTypeoffshore platform
ProjectCountryEgypt
ProjectLocationsuez
ProjectClientpetrosalam
SimilarProjects

  Baltim South West - 5873 ton

Nile Delta- Baltim concession area

PETROBEL

Baltim South West - 5873 ton

Fabrication, Pre-commissioning, Load out, Sea Fastening & assistance for offshore commissioning & Start-up of Baltim platform in the Mediterranean sea to connect 6 wells from Nodoco plant to Abo-Madi/Al Qoraa area with onshore pipeline 26’-18km. It’s expected to increase production capacity to 700 mm2/D

ZOHR CONTROL PLATFORM

Petrojet Maadia yard

PETROBEL

ZOHR CONTROL PLATFORM

Fabrication, Load out & sea-fastening of weight : 6000 Ton and Water Depth : 90 m

 Al Khafji Field Development Phase I (FDP‐I)

Al Khafji

(KJO) Khafji Joint Operations

Al Khafji Field Development Phase I (FDP‐I)

Engineering, Procurement, Fabrication, Transportation & Erection of 6 Offshore Platforms with a total weight of 17,000 Tons in addition to modifications of 5 existing platforms, new sub‐sea pipelines of total length 110 km sizes 28” / 36” / 42” and laying of 32 km subsea cables