"Kozzika" Storing Yard & Light Repair Workshop for Cairo Metro Line 1 (G2) Project
ProjectDetails

Engineering, Procurement and construction for Storing yard and light Repair Workshop: Interface Management Between G1, G2 and G3

ProjectTypeCIvil & Heavy Infrastructure
ProjectCountryEgypt
ProjectLocation
ProjectClientThe National Authority For Tunnels
SimilarProjects

DUBA PERMANENT BERTH

Red sea - Egypt / KSA

Aramco Overseas Co. / Saudi Aramco (IK)

DUBA PERMANENT BERTH

Duba Project is located on Red Sea coast North West of Saudi Arabia. This Project provides installation of new facilities which are capable of receiving gasoline and diesel fuel by large tankers up to 65,000 ton displacement. This facility includes: multiple products loading and firefighting equipment located on Berth, Interconnecting bridge to connect the Berth to onshore facilities.

SUEZ CANAL CORRIDOR DEVELOPMENT PROJECT ISMAILIA TUNNELS

Ismailia – Egypt

Engineering Authority for Armed Forces

SUEZ CANAL CORRIDOR DEVELOPMENT PROJECT ISMAILIA TUNNELS

A major Egyptian national development project started on August 2014, with the aim of maximizing the role of Suez Canal region as an integrated industrial and economic logistic hub, which will contribute in boosting Egypt’s economic growth. Petrojet scope of work includes: Engineering, Procurement and Construction for 2 motorway tunnels (twin tunnels) under Suez Canal north of Ismailia Road tunnels length (TBM) : 5.82 Km – Open Cut: 1.3 Km Internal Diameter: 11.4 m External Diameter: 12.6 m Distance between tunnels : 12.6 m Concrete wall thickness: 60 cm tunnel clear height: 5.5 m lanes number : 2 lanes/each lane width: 3.65 m Tunnel Slope: 3.3% Deepest point of the tunnel 53 m from sea level and 70 m from land level In addition to Execution of (4) Ventilation and Inspection Shafts each of: (internal Dia 23 m – Depth:80 m).

Gouna Port Quay wall Rehabilitation

Alexandria

Alexandria Petroleum Company

Gouna Port Quay wall Rehabilitation

EPC of rehabilitation works for quay walls no. 1,2,3,4 and 5 with total length of 875m and with 12m depth, including civil and electromechanical works.