Zohr gas field development

Construction of an onshore Gas complex (phase1) with a production capacity of 1.4 BCFD.

The offshore field development includes fabrication of control platform & deep water structures in addition to coating of subsea pipelines. Zohr Offshore field is located 180 km off the onshore plant in the Mediterranean sea and at a depth of 1450 m. The field has a total potential of about 2.7 TCF in place.

West Nile gas development

Development of gas treatment plant at Burullus to treat gas received from the offshore fields Taurus, Giza fayoum, & Raven. Petrojet scope of work is construction, E & I works. in addition to construction of tanks, fabrication of process equipment. Also it includes Polyethylene & concrete coating for subsea pipelines & fabrication of deep water structures.

ERC Refinery

Execution of  Civil, Mechanical works, steel structure, equipment and pipelines installation and Electrical works

Propylene & Polypropylene (PP) Complex

Construction of a petrochemical complex at Port Said, North of Egypt, consisting of a Propylene plant and a Polypropylene plant with respective annual production capacities of 350,000 tons as well as all appurtenant utilities and off-sites, including an air fractionation and refrigerating unit, and the required storage tanks. Propylene Plant is based on UHDE’s proprietary STAR Process for Propane dehydrogenation, while Polypropylene Plant is based on Basell’s Spheripol Process.

AMMONIA/UREA FERTILIZER COMPLEX

The establishment of a complete Ammonia/Urea complex including off sites facilities and interconnection

to Abu-Qir (1&2) with an Ammonia production capacity of 1200 Ton/Day and Urea Production Capacity of

1925 Ton/Day

Suez Canal CORRIDOR Development Project Ismailia TUNNELS

A major Egyptian national development project started on August 2014, with the aim of maximizing the role of Suez Canal region as an integrated industrial and economic logistic hub, which will contribute in boosting Egypt’s economic growth.

Petrojet scope of work includes: Engineering, Procurement and Construction for 2 motorway tunnels (twin tunnels) under Suez Canal north of Ismailia

Road tunnels length (TBM)  : 5.82 Km – Open Cut: 1.3 Km

Internal Diameter: 11.4 m

External Diameter: 12.6 m

Distance between tunnels : 12.6 m

Concrete wall thickness: 60 cm

tunnel clear height: 5.5 m

lanes number : 2 lanes/each

lane width: 3.65 m

Tunnel Slope: 3.3%

Deepest point of the tunnel 53 m from sea level and  70 m from land level

In addition to Execution of (4) Ventilation and Inspection Shafts each of: (internal Dia 23 m – Depth:80 m)

 