Petrojet

El Merk Oil Field Development Central Processing Facility Package

The El Merk Project aims at establishing the surface facilities required for the exploitation of hydrocarbon

liquid reserves of six reservoirs in Blocks 208, 405a and 212 in Algeria. The project comprises building a 98,000 bpd central processing facility including a 29,000 bpd condensate unit, a 31,000 bpd LPG unit and a 600 MMCFD NGL train Constructed of a 500 MMCF Of residue and re-injection gas compression and approximately 80,000 bpd of produced water treatment and re-injection facilities.


Project Type :
Oil Production
Location :
Algeria
Country :
Algeria
Client :
Groupement Berkine (JV of Sonatrach and Anadarko)

Certified: ISO 9001- ISO 14001
OHSAS 18001 - ISO 17025
ASME Stamps - API Q1 - Hull Structures