Construction of a gas pipeline with a total length of 165 km and diameter of 42″
1st Stage 92 km from El tina VR to Abu-Sultan
2nd Stage 73 Km from Abu-Sultan to New Capital
Construction of a gas pipeline with a total length of 165 km and diameter of 42″
1st Stage 92 km from El tina VR to Abu-Sultan
2nd Stage 73 Km from Abu-Sultan to New Capital
Certified: ISO 9001- ISO 14001
OHSAS 18001 - ISO 17025
ASME Stamps - API Q1 - Hull Structures