ASSIL & KARAM GAS DEVELOPMENT

Project aims at increasing the gas production at BED-3 up to 200 MMSCFD by bringing gas from newly discovered wells at Karam (5 Wells) and Assil (2 Wells) online. Development includes a new CO2 Removal Plant (CRP) to remove high CO2 content prior to further processing the gas at the existing BED-3 facilities to meet the export CO2 specifications

Al Khafji Field Development Phase I

Petrojet carried out installation of new 6 platforms, modifications in 5 existing platforms, new sub sea pipeline with total length of 110 km sizes 28” / 36” / 42” and laying of sub sea cables with total length of 8 km diameter 6” Located at the Joint operations area – North of Arabia Gulf.

Project is executed by consortium of PETROJET / ENPPI / PMS / RAWABI

 

Petroleum Sportive City

  • Execution of PETROSPORT Sportive City at New Cairo on an area of 45 Feddans including:
  • Outdoor court complex (football, volleyball, basketball, handball, and tennis)
  • Swimming pool  • Food court     • Stadium

HA’PY Platform

Platform Details:

Weight               : 3618 Ton

Water Depth      : 80 m

Scope of Works:

Fabrication, Load Out and Sea-Fastening.

Certified: ISO 9001- ISO 14001
OHSAS 18001 - ISO 17025
ASME Stamps - API Q1 - Hull Structures