Petrojet

Cairo – Suez Road

EPC for Two-way road ( Two-way road of Three-Lane / side (1 Concrete Lane for Heavy Loads) ) including associated construction works

Total Length: 20 km

Total width: 23,5 m

Mediterranean NGL Development

A natural gas liquids extraction facility relying on natural gas produced from North East Mediterranean fields (Al Temsah, Port Fouad, Habi, and Akhen) to extract natural gas derivatives.

It is designed to process 1100 MMCFD to produce 300 thousand tons of LPG for the local market, 280 thousand tons of propane for export, and million barrel per year of condensates, and to supply the olefin complex in the future with Ethane/Propane mixture by 400 thousand tons per year.

ASSIL & KARAM GAS DEVELOPMENT

Project aims at increasing the gas production at BED-3 up to 200 MMSCFD by bringing gas from newly discovered wells at Karam (5 Wells) and Assil (2 Wells) online. Development includes a new CO2 Removal Plant (CRP) to remove high CO2 content prior to further processing the gas at the existing BED-3 facilities to meet the export CO2 specifications

Al Khafji Field Development Phase I

Petrojet carried out installation of new 6 platforms, modifications in 5 existing platforms, new sub sea pipeline with total length of 110 km sizes 28” / 36” / 42” and laying of sub sea cables with total length of 8 km diameter 6” Located at the Joint operations area – North of Arabia Gulf.

Project is executed by consortium of PETROJET / ENPPI / PMS / RAWABI

 

Certified: ISO 9001- ISO 14001
OHSAS 18001 - ISO 17025
ASME Stamps - API Q1 - Hull Structures