Projects

Project image

Ta’iz Water Supply & Sanitation


The Project aims at the Rehabilitation of Water Networks west of the city of Ta’iz with a length of 392Km. and Rehabilitation & Extension of Sewerage System east of the city of Ta’iz with a length …

Country : Yemen
Client : Ministry of Environment and Water
Read More
Project image

GGP Export Pipeline & Fahud West Loop Line (12”- 46 Km and 30”- 56 Km)


  Full Construction scope of 2 pipelines in the middle of Sultanate of Oman, as follow: Fahud Pipeline12”- 46 Km GGP Pipeline    30”- 56 Km

Country : Oman
Client : Petroleum Development Oman
Read More
Project image

Duqm Pipeline (36”-221 Km)


Engineering, Procurement and Construction of 36”- 221 Km Pipeline from Saih Nihayda to Duqm Economic Zone

Country : Oman
Client : Oman Gas Company (OGC)
Read More
Project image

Arab Gas Pipeline (Stage II) Jordanian Gas Transmission Pipeline (393 Km – 36″)


This stage of the project covers the construction of 36”, 393 Km, polyethylene coated gas pipeline. The pipeline extends from Aqaba in the south of Jordan to the Samara and Rehab power stations in the …

Country : Jordan
Client : Jordanian Egyptian Fajr for Natural Gas Transmission & Supplies Ltd. (FAJR)
Read More
Project image

DISI Amman Mudawara Water Conveyance System


Transferring water extracted from the Ram Aquifer via a buried pipeline from the Disi area in the South to the city of Amman, 325 km north.

Country : Jordan
Client : Gama - (Jordanian Ministry of Water and Irrigation / DIWACO)
Read More
Project image

New Cold Crystallization Plant


Building a new unit facility to produce 450 KT annually of Potash, that is used in various chemical industries including fertilizers.

Country : Jordan
Client : Arab Potash Company “APC”
Read More
Project image

Ras Laffan Olefins (SP3)


Construction Contractor for SP3 Package. Execution of Civil & Mechanical Works for the U/T Area in addition to Interconnection Pipelines with Dolphin & Ras Gas Projects Plus Export Pipeline.

Country : Qatar
Client : Technip - Ras Laffan Olefins Company (RLOC)
Read More
Project image

SHARARA / MELLITAH (725 Km – 30″)


A development aiming to increase the export capacity of the Elephant Oil Field on Block NC in the Murzuk Basin operated by Agip to 150,000 b/d. expandable to 400,000 b/d. The development involves layi …

Country : Libya
Client : Eni Oil Libya
Read More
Project image

Haoud El Hamra-Skikda (NK1) (30” – 650Km)


Execution of the two Crude Oil Pipeline Lots from Haoud El Hamra at Hasi Masoud Area to Biskra and From Biskra to Skikda at the Mediterranean Sea with a total length of 650 Km to transport 1.5 Million …

Country : Algeria
Client : Sonatrach TRC
Read More
Project image

El Merk Oil Field Development Central Processing Facility Package


The El Merk Project aims at establishing the surface facilities required for the exploitation of hydrocarbon liquid reserves of six reservoirs in Blocks 208, 405a and 212 in Algeria. The project compr …

Country : Algeria
Client : Groupement Berkine (JV of Sonatrach and Anadarko)
Read More
Project image

Greater NEEM Crude Oil Pipeline


An EPC Contract awarded to the consortium of PETOJET & RAM Energy for the construction of a 16”- 100 Km Crude Oil Pipeline to transport dehydrated crude oil from NEEM to Diffra Field production Fa …

Country : Sudan
Client : Greater Nile Petroleum Operating Company
Read More
Project image

Yanbu Gas Plant Expansion


The primary objective of the project is providing facilities to process the additional C2+NGL volumes generated from 2006 – 2010 Business Plan crude increments, as well as providing feedstock supply t …

Country : Saudi Arabia
Client : Enppi - (Saudi Aramco)
Read More
Project image

Yanbu Export refinery-Solid handling package


Execution of civil and mechanical works solid handling package including conveyor belt, storage buildings, underground piping, piping, pipeline, steel structure, equipment erection, insulation and pai …

Country : Saudi Arabia
Client : Aramco- Techint
Read More
Project image

Petro Rabigh Phase 2 Refinery


Execution of Civil, Mechanical & Electrical works for the expansion of petro Rabigh refinery. The project aims at processing 30 MMC/Y of ethane and 3 MT/y of Naphta for the production of various t …

Country : Saudi Arabia
Client : Petrorabigh/Petrofac
Read More

Manifa Up stream pipelines


Engineering, Procurement & construction for Crude Oil Pipeline 

Country : Saudi Arabia
Client : Aramco
Read More

YAMAMA Cement Plant (Gas & crude oil) Pipeline Project


Construction of Civil , Mechanical , Electrical and instrumentation works for  ( Gas Pipeline  &  Crude Oil  pipeline )

Country : Saudi Arabia
Client : GAS Arabian Co & YAMAMA Cement Co
Read More
Project image

Yanbu Export Refinery


Execution of all civil & mechanical works for 33 cylindrical tanks and 13 spherical tanks including Interconnections between them, in addition to installation of (6) cylindrical tanks at yanbu SP1

Country : Saudi Arabia
Client : Aramco- Enppi
Read More

Nuayyim fields pipelines


Engineering, Procurement, and Construction for Onshore Gas, water and oil Pipelines

Country : Saudi Arabia
Client : Aramco
Read More

Expansion of Hout onshore production facilities


Execution of Civil, Mechanical and E & I works for HOUT onshore production facilities  

Country : Saudi Arabia
Client : Al Khafji Joint Operations (KJO)
Read More
Project image

Al Khafji Field Development Phase I


Petrojet carried out installation of new 6 platforms, modifications in 5 existing platforms, new sub sea pipeline with total length of 110 km sizes 28” / 36” / 42” and laying of sub sea cables with to …

Country : Saudi Arabia
Client : Al Khafji Joint Operations (KJO)
Read More
Project image

DUBA Permanent Berth


Duba Project is located on Red Sea coast North West of Saudi Arabia. This Project provides installation of new facilities which are capable of receiving gasoline and diesel fuel by large tankers up to …

Country : Saudi Arabia
Client : Aramco Overseas Co. / Saudi Aramco (IK)
Read More
Project image

Luberef Expansion Refinery


Execution of civil and mechanical works for the expansion of oil refinery S1 package for increasing production capacity  

Country : Saudi Arabia
Client : Samsung
Read More
Project image

KHOUR El ZUBAIR – NASSRIYAH LPG Pipeline


Execution of Khour El Zubair – Nassriyah Gas Pipeline with a diameter 16″ from Khour El Zubair in BASRAH to Nassriyah Pump Station with total length 200 Km.

Country : Iraq
Client : Oil Pipeline Company (OPC)
Read More
Project image

UPPER EGYPT GAS PIPELINE PROJECT


Execution of a Gas Pipeline from Dahshour to Aswan as part of the National Plan for developing Upper Egypt. The pipeline was executed over a number of segments starting from Kuraimat up to Aswan passi …

Country : Egypt
Client : Egyptian Natural Gas Co.GASCO
Read More
Project image

Ain Sokhna /wadi hagool/Al-Hafayer Crude Oil (30”-42 km)


Pipe coating works, and Civil, Mechanical, and Electrical works for Ain Sokhna/wadi hagool/ Al-Hafayer (30”-42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room

Country : Egypt
Client : Petroleum Pipelines Co. PPC
Read More
Project image

Ethane/Propane (C2 / C3) Maximization


A project aiming at increasing the production of the C2 – C3 by introducing modification in both Amereya LPG recovery plant and the WDGC in addition to the installation of new facilities at both plant …

Country : Egypt
Client : Egyptian Natural Gas Company
Read More
Project image

Linear Alkyl Benzene (LAB) Project


Development of a Linear Alkyl Benzene Plant in Alexandria, North of Egypt with a production capacity of 100,000 Tons/Year. Plant consists of Process Unit–Utilities – Storage Facilities – Service Build …

Country : Egypt
Client : ELAB
Read More
Project image

Egyptian Liquefied Natural Gas (LNG) Project


A two – train Liquefied Natural Gas (LNG) plant each with a capacity of approximately 3.6 MT/Y on approximately 165 hectares of land located 3 km from the town of Idku and 40 km East of Alexandria on …

Country : Egypt
Client : Bechtel - (Egyptian Liquefied Natural Gas Co. (ELNG) (JV formed of EGAS, EGPC, BG,Petronas & Gas de France)
Read More
Project image

HEATER 10-H-01


Equipment Details: Weight                      :625  Ton Material                    :C.S. Internal Diameter   : 3 – 5  m Length                      :35  m Plate Thickness       : 45  mm

Country : Egypt
Client : Suez Oil Processing Co.
Read More
Project image

SUMED EXPANSION OF SUMED STORAGE CAPACITY – PHASE III


Engineering, Procurement (Except Plates) & Construction of (3) Storage Tanks (120,000 m3 / tank) to increase the Storage capacity for SUMED Co. at Sidi Krir.

Country : Egypt
Client : Arab Petroleum Pipeline Co. (SUMED
Read More
Project image

SUMED EXPANSION OF SUMED STORAGE CAPACITY – PHASE IIII


Construction of 6 x175,000 m3 Cylindrical Tanks with associated Civil, Piping & Electrical works at Ain Sokhna Terminal

Country : Egypt
Client : Arab Petroleum Pipeline Co. (SUMED)
Read More
Project image

(4) LPG Spherical tanks


Civil, Mechanical and Electrical works for (2) storage tanks with a capacity of 4000 m3 and (2) storage tanks  with a capacity of 2400 m3

Country : Egypt
Client : Petrogas
Read More
Project image

(7) LPG Spherical tanks


Civil, Mechanical and Electrical works for (7) storage tanks with a capacity of 2400m3  

Country : Egypt
Client : Petrogas
Read More
Project image

Al-Gamil/Damietta (42”-50 km)


Engineering, Procurement and Construction of 42”-50 km Pipeline including 23 HDD crossings to connect Al-Gamil valve rooms to New Damietta electric station

Country : Egypt
Client : GASCO
Read More
Project image

Midor refinery


Developing Midor Refinery Plant – Pre-flash Tower Unit to increase production capacity by 15% (115 Ton/year)

Country : Egypt
Client : Midor
Read More
Project image

Salam Gas Trains (T3 & T4) Project


The target of the project is to increase the productivity of El Salam gas station to 410 MMCFD by doubling the processing units to 4 units then transporting the processed gas by el Obayed /el Amerya p …

Country : Egypt
Client : Petrofac - Khalda Petroleum Co.
Read More
Project image

Ethylene production plant


Execution of Civil & Electromechanical works including equipment fabrication for Ethylene production plant Plant Production Capacity (460 KMT/Year)

Country : Egypt
Client : JV (TOYO/ ENPPI
Read More
Project image

DESALINATION PACKAGES


Material      : C.S, S.S, and Alloy / Unit Capacity     : Up to 5100 m3/day Dimensions  : Up to D: 2.7 m  L: 14 m   Thk: 74 mm

Country : Egypt
Client : General Petroleum Company - GPC Project
Read More
Project image

TRANS GULF LPG EXPANSION – Ras Bakr


Engineering, Procurement & Construction of spherical Tanks (5000m3/ton )

Country : Egypt
Client : The Egyptian General Petroleum Corporation (EGPC
Read More
Project image

SKID MOUNTED PACKAGES


Material       : C.S, S.S, Cladded and Duplex Weight         : Up to 220 Ton Dimensions  : Up to 21m x 6 m x 6.5 m

Country : Egypt
Client :
Read More
Project image

Air Coolers


Material     : C.S, S.S & Alloy Material Weight       : Up to 160 Ton Dimensions: Up to 14 m x 5.5 m x 4.2 m

Country : Egypt
Client : Burullus Gas Company
Read More
Project image

Absorber-Desorber Columns


Equipment Details: Weight                       : 175       Ton Material                     : SA 516-70 Length                       : 60.9      m Plate Thickness          : 24       mm

Country : Egypt
Client : UHDE Gmbh
Read More
Project image

De-PROPANIZER Tower c2c3


Equipment Details: Weight                       :         147       Ton Material                     :         SA 516-70 Internal Diameter     :  5 – 3.2   m Length                       :  35.6       …

Country : Egypt
Client : GASCO
Read More
Project image

De-Methanizer Column 10-C-01 Mediterranean NGL Development PROJECT


Equipment Details: Weight                      : 380 Ton Material                    : SA 240-304 Internal Diameter   : 4.5   m Length                      : 38   m Plate Thickness       : 76  mm …

Country : Egypt
Client : UGDC
Read More
Project image

El – TEMSAH Development


Jacket, Deck & TSF Sea-fastening

Country : Egypt
Client : PETROBEL
Read More
Project image

HA’PY Platform


Platform Details: Weight               : 3618 Ton Water Depth      : 80 m Scope of Works: Fabrication, Load Out and Sea-Fastening.

Country : Egypt
Client : GUPCO .
Read More
Project image

Simian Platform


Weight             :  2163 Ton Water Depth    :  61 m Scope of Works: Fabrication, Load Out and Sea-Fastening.

Country : Egypt
Client : Burullus.
Read More
Project image

NAQ PIII ABU-QIR


Platform Details: Weight :  3210 Ton Water Depth :  33  M Scope of Works: Fabrication, Load Out and Sea-Fastening.

Country : Egypt
Client : Abu-Qir Petroleum
Read More
Project image

AL-AMAL PLATFORM


Platform Details: Weight                    :  1055  Ton Water Depth           :         25      M  Scope of Works: Design, Procurement, Fabrication, Load Out and Sea-Fastening.

Country : Egypt
Client : Aquaterra
Read More
Project image

DEEPWATER STRUCTURES WND (TAURUS & LIBRA)


Platform Details: Weight                    :  2260  Ton Water Depth           :         800     M Scope of Works: Fabrication, Load Out and Sea-Fastening in Taurus & Libra fields.

Country : Egypt
Client : BP / Subsea 7
Read More
Project image

Zohr control platform


Platform Details weight               : 5025 Ton Water Depth      :  90 m Project scope of work Fabrication, Load out & sea-fastening

Country : Egypt
Client : PETROBEL
Read More
Project image

Ramadan – 6 Platform Rehabilitation


Project scope of work: Fabrication of Piping work :13.500 D.I.

Country : Egypt
Client : Gulf Of Suez Petroleum Co. Gupco
Read More
Project image

Zohr DEEPWATER STRUCTURE


  Platform Details weight                 : 2498 Ton Water Depth      : 1500 M  

Country : Egypt
Client : saipem
Read More
Project image

NAO & HH Platforms


Platform Details weight : 2400 Ton Water Depth : 23.5 M Project scope of work Procurement, Fabrication, and pre-commissioning

Country : Egypt
Client : General Petroleum Company - GPC Project
Read More
Project image

Suez Canal CORRIDOR Development Project Ismalia TUNNELS


Engineering, Procurement and construction for 2 tunnels (two roads) under Suez Canal north of Ismailia Road Tunnels Length (TBM)  : 6.1 Km – Open Cut: 1.3 Km Execution of (4) Ventilation and Inspectio …

Country : Egypt
Client : Engineering Authority for Armed Forces
Read More
Project image

New Suez Canal – Dry Excavation Phase


Dry excavation of New Suez Canal at the section 88km to 89km with total volume 11 million m3

Country : Egypt
Client : Engineering Authority for Armed Forces
Read More
Project image

Suez Canal Container Terminal (SCCT) phase ii


Construction of the SCCT onshore works of Phase II on  an area of 640,000 m2 in addition to expansion works of the facilities and services of Phase I already in operation.

Country : Egypt
Client : Suez Canal Container Terminal Co.
Read More
Project image

Cairo – Suez Road


EPC for Two-way road ( Two-way road of Three-Lane / side (1 Concrete Lane for Heavy Loads) ) including associated construction works Total Length: 20 km Total width: 23,5 m

Country : Egypt
Client : General Authority for Roads, Bridges & Land Transport
Read More
Project image

Benha / Alexandria (5th section)


EPC of 5th section of Benha/Alexandria road including associated construction works. The Project consists of 12 Bridges, 18 Tunnels, 8 roads

Country : Egypt
Client : General Authority for Roads, Bridges & Land Transport
Read More
Project image

Elmenia – Ras Ghareb Road


EPC for Two-way road including associated construction works   Total Length: 55 km   Total width: 23,4 m   Two-way road of Three-Lane / side  

Country : Egypt
Client : General Authority for Roads, Bridges & Land Transport
Read More
Project image

6th of October main corridors (3rd corridor)


EPC of 3rd corridor at 6th of october city for the section connecting Zewail university with Wahat road, including associated construction works. 2 way road (11M width) 2 concrete lanes for heavy load …

Country : Egypt
Client : 6th Of October City Authority
Read More
Project image

Petroleum Sportive City


Execution of PETROSPORT Sportive City at New Cairo on an area of 45 Feddans including: Outdoor court complex (football, volleyball, basketball, handball, and tennis) Swimming pool  • Food court     • …

Country : Egypt
Client : Egyptian Sportive Services Company for Petroleum Workers (PETROSPORT)
Read More
Project image

JET Beach Resort – Ain Sokhna


Building a Touristic Resort on an Area of 75,420 m2 at Ain Sokhna on the Red Sea Coast.The Resort includes the following:   Chalets Area • Hotel Area Services Area • Landscape Beach Area

Country : Egypt
Client : PETROJET
Read More
Project image

El-Tor City resedintial Buildings


Implementing 30 Residential Buildings within the housing project for the members of the Armed Forces in the Future City

Country : Egypt
Client : Engineering Authority of Egyptian Armed Forces
Read More
Project image

Gardenia residential Buildings


Execution of the concrete structure and finishes to the number of (20) Residential Buildings composed of Six levels include Core and shell and Finishes Works for the Project Buildings and units.

Country : Egypt
Client : Engineering Authority of Egyptian Armed Forces
Read More
Project image

Future City residential Buildings


Implementing 10 Residential Buildings within the housing project for the members of the Armed Forces in the Future City El-Tor City residential Buildings

Country : Egypt
Client : Engineering Authority of Egyptian Armed Forces
Read More
Project image

PETROJET New Admin. Building


Building PETROJET’s New Corporate Head Quarter at New Cairo (5th Settlement) on an area of 17,000 m2 as follows: Main Building: 3,100 m2 West Wing : 775 m2 South Wing : 775 m2 Parking : 9,000    m2

Country : Egypt
Client : PETROJET
Read More
Project image

EChem New Admin. Building


Building ECHEM New Admin Building at New Cairo on an area of 3,000 m2 comprising of a basement, ground floor and four typical floors in addition to a 4,200 m2 auditorium and a 2,225 m2 Services Buildi …

Country : Egypt
Client : Petrochemicals Holding Company (ECHEM)
Read More
Project image

Tharwa Petroleum Company New Admin Building


Building Tharwa New Admin Building at New Cairo on an area of 4,200 m2 consisting of a basement, ground floor and four typical floors

Country : Egypt
Client : Tharwa Petroleum Company
Read More
Project image

MIDTAP New Admin Building


Building MIDTAP New Admin Building at New Cairo on an area of 4,400 m2 consisting of a basement and four typical floors

Country : Egypt
Client : Middle East Oil Tankage and Pipelines Co. (MIDTAP)
Read More
Project image

Port Said Harbor Navigation Tower


Execution of all construction and finishing works for the navigation complex including a 39m high navigation tower, an administration building on an area of 1200 m2 an underground tank, a power statio …

Country : Egypt
Client : Port Said Port Authority
Read More
Project image

Development of Adabiya port


Construction of Dry Cast Plant inside Al Adabiya port in Suez in two phases on the western coast of Suez Gulf, and it is 17 km away from Suez City

Country : Egypt
Client : General Authority for the Suez Canal -SCZone
Read More
Project image

Zohr Plant


Building an onshore Gas complex (phase1) with a  production capactiy of 1.4 BCFD. The project is 190 km from Zohr Field located in the Mediterranean sea. The Field has a total potential of about 300 T …

Country : Egypt
Client : PETROBEL / ENI
Read More
Project image

West Nile gas development


Development of WND fields, the project consists of  2 phases. The 1st phase involves the development of Raven with a capacity of 600 MMCFD while the 2nd  phase involves the development of Giza Fayoum …

Country : Egypt
Client : Bechtel
Read More
Project image

Burullus facitilities for Gas Processing plant (Taurus/Libra)


Rehabilitation of Burulus facilities for gas processing plant of Taurus/Libra wells which have the capacity of processing 600 MMCFD

Country : Egypt
Client : BP
Read More
Project image

E-Methanex Methanol Plant


Development of a Greenfield 1.3 million ton per year methanol facility at Damietta on the Mediterranean Sea in Egypt.

Country : Egypt
Client : Techint - (Egyptian Methanex Methanol Company)
Read More
Project image

AMMONIA/UREA FERTILIZER COMPLEX


The establishment of a complete Ammonia/Urea complex including off sites facilities and interconnection to Abu-Qir (1&2) with an Ammonia production capacity of 1200 Ton/Day and Urea Production Cap …

Country : Egypt
Client : Alexfert co./UHDE Gmbh
Read More
Project image

Propylene & Polypropylene (PP) Complex


Building a petrochemical complex at Port Said, North of Egypt, consisting of a Propylene plant and a Polypropylene plant with respective annual production capacities of 350,000 tons as well as all app …

Country : Egypt
Client : UHDE - (Egyptian Propylene & Polypropylene Co. (EPPC)
Read More
Project image

Mediterranean NGL Development


A natural gas liquids extraction facility relying on natural gas produced from North East Mediterranean fields (Al Temsah, Port Fouad, Habi, and Akhen) to extract natural gas derivatives. It is design …

Country : Egypt
Client : United Gas Derivatives Company (UGDC) (JV formed of EGAS, BP & IEOC , AGIP)
Read More
Project image

ASSIL & KARAM GAS DEVELOPMENT


Project aims at increasing the gas production at BED-3 up to 200 MMSCFD by bringing gas from newly discovered wells at Karam (5 Wells) and Assil (2 Wells) online. Development includes a new CO2 Remova …

Country : Egypt
Client : Enppi - (BAPETCO / SHELL)
Read More
Project image

Maximizing of gas recovery unit at Assuit Refinery (vru)


Maximizing the efficiency of Gas Recovery Unit to increase LPG production to 400 KT/year

Country : Egypt
Client : ASORC
Read More
Project image

Development of phenol extraction unit


Developing the extraction with phenol unit to be replaced by N.M.B for saving environment, and increasing production capacity to 283 KT/year

Country : Egypt
Client : Al- Amreya Petroleum Refining Co.(APRC)
Read More
Project image

ERC Refinery


Execution of  Civil, Mechanical works (steel structure, equipment and pipelines installation) and Electrical works

Country : Egypt
Client : GS Engineering & Construction
Read More