NEW SUEZ CANAL – DRY EXCAVATION PHASE
ProjectDetails

Dry excavation of New Suez Canal at the section 88km to 89km with total volume 11 million m3.

ProjectTypeInfrastructure
ProjectCountryEgypt
ProjectLocationSuez – Egypt
ProjectClientEngineering Authority for Armed Forces
SimilarProjects

THARWA PETROLEUM COMPANY NEW ADMIN BUILDING

New Cairo

Tharwa Petroleum Company

THARWA PETROLEUM COMPANY NEW ADMIN BUILDING

Building Tharwa New Admin Building at New Cairo on an area of 4,200 m2 consisting of a basement, ground floor and four typical floors.

Metro line 4 phase 1 project
Metro line 4 phase 1 project

construction of Cairo Metro line Phase 1 in consortium with Enppi, Arab Contractors, Hassan Allam , and Concord the works include construction of 3 stations

CAIRO – SUEZ ROAD

Cairo – Suez Road

.General Authority for Roads, Bridges & Transp

CAIRO – SUEZ ROAD

EPC for Two-way road ( Two-way road of Three-Lane / side (1 Concrete Lane for Heavy Loads) ) including associated construction works with total Length: 20 km and total width: 23,5 m