CAIRO – SUEZ ROAD
EPC for Two-way road ( Two-way road of Three-Lane / side (1 Concrete Lane for Heavy Loads) ) including associated construction works with total Length: 20 km and total width: 23,5 m
Construction of Dry Cast Plant inside Al Adabiya port in Suez in two phases on the western coast of Suez Gulf, and it is 17 km away from Suez City.
Cairo – Suez Road
.General Authority for Roads, Bridges & Transp
EPC for Two-way road ( Two-way road of Three-Lane / side (1 Concrete Lane for Heavy Loads) ) including associated construction works with total Length: 20 km and total width: 23,5 m
Middle Ring Road
6th of October City Development Authority
EPC of the middle ring road passing through the industrial residential section with a total length of 10.5 km. In addition to construction of 3 pedestrian bridges in the 6th of October city
Sixth of October City Development Authority
EPC of civil works for the development of the middle road within the range of the industrial residential interval of 10.5 km. The works also include the construction of 3 bridges in 6th of October City.