BU HASA SWAG CO2 EOR Pilot
ProjectDetails

Engineering, Procurement & Construction of Civil, Mechanical and E & I works at Bab SinGap Pilot Reduction Degassing Station in addition to 52 km CO2 , Water, & Oil pipelines

ProjectType
ProjectCountryUAE
ProjectLocationBu Hassa- Abu Dhabi
ProjectClientADNOC Onshore
SimilarProjects

BU HASA SWAG CO2 EOR Pilot

Bu Hassa- Abu Dhabi

ADNOC Onshore

BU HASA SWAG CO2 EOR Pilot

Engineering, Procurement & Construction of Civil, Mechanical and E & I works at Bab SinGap Pilot Reduction Degassing Station in addition to 52 km CO2 , Water, & Oil pipelines

ANOPC hydrocracking complex

Assiut

ANOPC, Technip, Enppi

ANOPC hydrocracking complex

The project aims to refine 2.5 million tons/year produced by ASORC into high quality products like naphta , butane, and diesel Petrojet scope of work: EPC of administrative & accommodation buildings, waste water treament unit, and storage tanks,

EGYPTIAN LIQUEFIED NATURAL GAS (LNG) PROJECT

Idku

Bechtel - (Egyptian Liquefied Natural Gas Co. (ELN

EGYPTIAN LIQUEFIED NATURAL GAS (LNG) PROJECT

A two – train Liquefied Natural Gas (LNG) plant each with a capacity of approximately 3.6 MT/Y on approximately 165 hectares of land located 3 km from the town of Idku and 40 km East of Alexandria on the Egyptian Mediterranean coast. Technology utilized is the Phillips Optimized Cascade liquefaction technology. The Facility includes 2 Cryogenic Tanks each with a capacity of 140,000 m3, Common Facilities (including Power Generation, Fire Water Systems and Control Building) and Marine Facilities.