BU HASA SWAG CO2 EOR Pilot
Engineering, Procurement & Construction of Civil, Mechanical and E & I works at Bab SinGap Pilot Reduction Degassing Station in addition to 52 km CO2 , Water, & Oil pipelines
Package I Revamp existing vacuum ditllation unit (40,000bpsd to 65,000bpsd) Upgrade existing HCU (23,000bpsd to 34,500bpsd) Upgrade existing IDW (18,217bpsd to 29,147bpsd) Utilities: Upgrade existing utilities to meet the revamp requirements of ISBL Process support until upgrade (SRU, HRU, ARU & SWS) Pacakge II Product Distribution System: install & upgrade the product distribution system (Tanks, Pipelines & Loading Arms) to meet the revamp requirements Utilities: Upgrade existing utilities to meet the revamp requirements of OSBL
Bu Hassa- Abu Dhabi
ADNOC Onshore
Engineering, Procurement & Construction of Civil, Mechanical and E & I works at Bab SinGap Pilot Reduction Degassing Station in addition to 52 km CO2 , Water, & Oil pipelines
Alexandria – Egypt
Egyptian Natural Gas Company
A project aiming at increasing the production of the C2 – C3 by introducing modification in both Amereya LPG recovery plant and the WDGC in addition to the installation of new facilities at both plants. Turbo expander technology is utilized in both plants to maximize C2 and c3 production. The projects scope of work also covers modifications to upgrade the existing process facilities and utilities at both plants.
Alexandria - Egypt
JV (TOYO/ ENPPI
Construction of a 460,000 ton/year ethylene plant and a 20,000 ton/year butadiene extraction plant as part of Ethydco’s petrochemical complex. The plant is built based on the most advanced ethylene technology of Lummus Technology of the U.S.. Petrojet scope of work: full construction in addition to fabrication of process equipment