AIN SOKHNA /WADI HAGOOL/AL-HAFAYER CRUDE OIL (30”- 42 KM)
Pipe coating works, and civil, mechanical, and electrical works for Ain Sokhna/Wadi hagool/ Al-Hafayer (30”- 42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room
Pipe coating works, and civil, mechanical, and electrical works for Ain Sokhna/Wadi hagool/ Al-Hafayer (30”- 42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room
Petroleum Pipelines Co. PPC
Pipe coating works, and civil, mechanical, and electrical works for Ain Sokhna/Wadi hagool/ Al-Hafayer (30”- 42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room
Abu Dhabi - UAE
Abu Dhabi National Oil Company (ADNOC)
The project aims at construction of a natural gas distribution network in the emirate of Abu dhabi. The project covers design, construction, operation, maintenance, emergency activities and communication network including high pressure gas pipelines and natural gas distribtuion network ending at residential, commercial and industrial customer’s appliances. The scope aslo includes customer acquisition, customer service, type approvals of gas meters/appliances and the design, construction and operation of a gas operations and service center. Phase 1 Includes packages 5 to 16 with reference to the construction of 4 bar distribution pipelines petrojet is awarded packages 5, 6, 7, & 11. Petrojet scope of work is Engineering, Procurement, & Construction of a City Gas Network with an approximate lenght of 64 Km at Emirates Abu Dhabi. Works inlcude Civil, Mechanical and Cathodic protection works.
Aqaba to north of Jordan
Jordanian Egyptian Fajr for NG Transmission
This stage of the project covers the construction of 36”, 393 Km, polyethylene coated gas pipeline. The pipeline extends from Aqaba in the south of Jordan to the Samara and Rehab power stations in the north of Jordan for about 370 Km and an additional stage to extend the pipeline to the Jordanian / Syrian border for about 24 Km