ZOHR CONTROL PLATFORM
ProjectDetails

Fabrication, Load out & sea-fastening of weight : 6000 Ton and Water Depth : 90 m

ProjectTypeplatform
ProjectCountryEgypt
ProjectLocationPetrojet Maadia yard
ProjectClientPETROBEL
SimilarProjects

AL-AMAL PLATFORM

Red Sea

Aquaterra

AL-AMAL PLATFORM

Engineering, procurement, fabrication and Load Out and Sea-Fastening of platform with total Weight 1055 Ton Water Depth : 25 M

 Al Khafji Field Development Phase I (FDP‐I)

Al Khafji

(KJO) Khafji Joint Operations

Al Khafji Field Development Phase I (FDP‐I)

Engineering, Procurement, Fabrication, Transportation & Erection of 6 Offshore Platforms with a total weight of 17,000 Tons in addition to modifications of 5 existing platforms, new sub‐sea pipelines of total length 110 km sizes 28” / 36” / 42” and laying of 32 km subsea cables

PETROSALAM  PLATFORM

suez

petrosalam

PETROSALAM PLATFORM

The project is Consortium between ENPPI And PETROJET Engineering, procurement, fabrication, Pre-commissioning, and Commissioning assistant for Offshore Production Unit with Drilling offshore Jack Up Rig