BURULLUS FACILITIES FOR GAS PROCESSING PLANT (TAURUS/LIBRA)
ProjectDetails

Rehabilitation of Burulus facilities for gas processing plant of Taurus/Libra wells which have the capacity of processing 600 MMCFD

ProjectTypePetrochemical
ProjectCountryEgypt
ProjectLocationEgypt
ProjectClientBp
SimilarProjects

West Delta Gas Plants Development

western desert

Bechtel

West Delta Gas Plants Development

Executing civil, mechanical and electrical works for onshore facilities to connect to five fields in the concession area north of Alexandria and the western Mediterranean with a production capacity of 2.2 billion cubic feet per day. The works include the construction of the Raven gas station with a production capacity of 900 million cubic feet per day and the development of the Burullus gas station to connect to the Giza-Fayum wells to produce 600 million cubic feet, with the aim of increasing gas production to reach 1.6 billion cubic feet of gas and condensate in addition to the Turous Libra field.

Atoll field Development

Port Said

Pharaonic Petroleum Co. (PhPC)

Atoll field Development

Development of ATOLL field that aims to increase production capacity to 380 mmscfd of natural gas. Petrojet scope of work includes Civil, Mechanical, E & I works. it also includes EPC for 2 pressure vessels, rehabilitaion for existing low temperature separator, & fabrication of deep water structures with total weight of 840 tons

ZOHR GAS FIELD DEVELOPMENT

Port Said

PETROBEL / ENI

ZOHR GAS FIELD DEVELOPMENT

Construction of onshore gas plant on an area of 2.5 million m2 on 2 phases The first Phase includes inlet facilities, EPF, 4 production Trains, 2 SRUs, Utilities and Flair. It has been completed with gas production capacity that reached 2 BCFD. In parallel and during Completion of the first phase, Petrojet have started construction works in second phase that includes additional 3 production Trains, 2 SRUs, Utilities and Flair. phase 2 aims to increase gas production to more than 2.8 BCFD On the other hand, Petrojet carries out the fabrication of offshore structures for Zohr offshore field that is located 200 km off the onshore plant in the Mediterranean sea operations and at a depth of 1,500 meters. The fabrication works includes fabrication of control platform & deep water structures in addition to coating of 707 km Subsea pipelines with polyethylene and concrete. The Field has a total potenial of about 30 TCF in place.