E-METHANEX METHANOL PLANT
ProjectDetails

construction of Methanol plant to produce of 1.3 million ton per year in Damietta on the Mediterranean Sea in Egypt.

ProjectTypePetrochemical
ProjectCountryEgypt
ProjectLocationDamietta, Egypt
ProjectClientTechint - (Egyptian Methanex Methanol Company)
SimilarProjects

DEVELOPMENT OF PHENOL EXTRACTION UNIT

Egypt

Al- Amreya Petroleum Refining Co.(APRC)

DEVELOPMENT OF PHENOL EXTRACTION UNIT

Developing phenol unit extraction to be replaced by N.M.B for saving environment, and increasing production capacity to 283 KT/year

MIDOR REFINERY

Alex

Technip

MIDOR REFINERY

Development of a modern grassroots refinery to expand the production capacity from 100,000 BPSD to 160,000 BPSD whilst maximizing distillate production. Petrojet scope of work includes Construction, Precommissioning, & Commissioning assistance.

RUMAITHA AND SHANAYEL PROJECT UAE

Rumaitha/Shanayel area

Abu Dhabi Company for Onshore Petroleum Operations

RUMAITHA AND SHANAYEL PROJECT UAE

Part 1 : Rumaitha/Shanayel Production Restoration Rumaitha/Shanayel restoration consists of (14 wells) to compensate production from high GOR wells (6 OP and 8 WAG). All producer wells are expected to be provided with gas lift. It includes two “Ra/Sn Phase III Batch 2” wells brought forward to year 2018 (Ra-122 oil producer and Ra-123 WAG injector). Part 2 : Rumaitha Technical Rate Rumaitha Phase I/II production requires sustaining its 20% technical rate. This requires drilling six (6) oil producers and six (6) WAG injectors, Two oil producers out of the six are “Ra/Sn Phase III Batch 2” wells brought forward and two WAG injectors out of the six injectors are “Ra/Sn Phase III Batch 2” wells which are brought forward. The Batch 2 wells are located in Cluster Y. Production from clusters GG and FF will be routed to CPP phase I/II.