Assiut
Enppi
ASORC Naphtha Complex Utilities & Offsite
Petrojet scope of work includes all Civil & Mechanical Works of both the UTILITIES/OFFSITE and ISBL, including procurement, design, fabrication, inspection, construction, installation, erection, testing, pre-commissioning activities and assistance during commissioning and start up
suez
Nasr Petroleum Co. NPC
Crude Distillation Unit (CDU4)
Engineering, Procurement, Construction, E&I works, pre-commissioning and commissioning and start up works of total 4 crude distillation units with 35 equipment of a total weight 900 tons and steel structures of 10000 tons and a refining capacity of 6.5 mmty Products: LPG, Naphtha, Kerosene, Jet Fuel, Gas Oil, Fuel Oil and Bitumen
Amal petroleum company
Amal waste water treatment plant
The treatment process is carried out by treating industrial waste water through biological, chemical, and mechanical approaches with a capacity of 1250 m3/d The smart processors used in this treatment plant are easy to operate. They are designed to achieve maximum efficiency and ensure the highest quality standards and climate tolerance depending on the plant site
Sixth of October City Development Authority
Middle Ring Road Development
EPC of civil works for the development of the middle road within the range of the industrial residential interval of 10.5 km. The works also include the construction of 3 bridges in 6th of October City.
Suez
Suez Oil Processing Co.
Coker Complex
Consortuim (Petrojet & Enppi) in developing & upgrading of Coker complex including Engineering, Procurement and Construction works
western desert
gasco
de methanizer column
de methanizer column is 60.9 meters long and weighs 470 tons, it's fabricated in order to increase the production capacity of the Complex’s 4th production line from 600 million ft3/day to 1500 million ft3/day
suez
El Nasr petroleum
El Nasr waste water treatment plant
engineering, construction, procurement and commissioning of waste water treatment plant for El Nasr company
Wotech Company
Wotech Plant
Engineering, Construction, Procurement, commissioning & Pre commissioining of Wotech plant for medium-density fiberboards (MDF) with production capacity of 205 thousand m3 annually, using technologies by Germany's plant engineering firm Siempelkamp, which carries out the project using rice straw
Metro line 4 phase 1 project
construction of Cairo Metro line Phase 1 in consortium with Enppi, Arab Contractors, Hassan Allam , and Concord the works include construction of 3 stations
Ain El Sokhna
Transport Ministry - Suez Canal Authority
Sokhna Port Quay wall
Construction and Diaphragm works of 800 M quay wall with 18 M Depth including commercial and Logistic Terminal and related facilities, includes installation and pouring of: - Fenders - 450 Piles. - Gaskets – Flexible Joints.
Alexandria
Alexandria Petroleum Company
Alexandria Port Quay wall Rehabilitation
EPC for rehabilitation works of quay walls no.1,2,3,4 & 5 with total length of 875 m & with 12 m depth, including civil and electromechanical works.
Cairo
New Urban Communities Authority
tunnels & basic infrastructure (New administrative capital)
Supply, implementation and Coordination of the site, infrastructure, buildings, gates, service centers, cinemas and restaurant complex for the central park for the new administrative capital, with an area of (94 acres)
General Petroleum Corporation
Crude oil depots
Engineering, Construction and Procurement of (29) crude oil storage tanks with a total capacity of 175,000 m3 for each storaage tank and a diameter of 110 m in areas: Ras Badran (12 tanks) Agrood (6 tanks) shoukair (5 tanks) Ras Gharib (6 tanks)
Ain El Sokhna
El Nasr co. for intermediate chemicals
Nitrogen fertilizer Complex
Consortuim (Petrojet & thyssenkrupp) in construction of 6 plants with total production capacity up to 1.7 million tons/year
suez
The Armed forces of Engineering Authority
NORTH MARTYR AHMED HAMDY TUNNEL
Petrojet completed construction of North Martyr Ahmed Hamdy tunnel The tunnel has two lanes with a length of 4.250 kilometers and a diameter of 11 meters,
Mostorod - Qalyoubia
GS Engineering & Construction
ERC REFINERY
Petrojet scope of work: execution of Civil, Mechanical, E & I works for ERC refinery Upgrading the existing CORC refinery to eliminate 93,000 tons of Egypt’s sulfur emissions. the refinery will convert lowest value fuel oil into middle & light distillates. ERC will have the capacity to produce 4.2 million tons of refined products per year, including 2.3 million tons of Euro V diesel representing more than 50% of Egypt’s current imports & 600,000 tons of jet fuel.
Port Said
PETROBEL / ENI
ZOHR GAS FIELD DEVELOPMENT
Construction of onshore gas plant on an area of 2.5 million m2 on 2 phases The first Phase includes inlet facilities, EPF, 4 production Trains, 2 SRUs, Utilities and Flair. It has been completed with gas production capacity that reached 2 BCFD. In parallel and during Completion of the first phase, Petrojet have started construction works in second phase that includes additional 3 production Trains, 2 SRUs, Utilities and Flair. phase 2 aims to increase gas production to more than 2.8 BCFD On the other hand, Petrojet carries out the fabrication of offshore structures for Zohr offshore field that is located 200 km off the onshore plant in the Mediterranean sea operations and at a depth of 1,500 meters. The fabrication works includes fabrication of control platform & deep water structures in addition to coating of 707 km Subsea pipelines with polyethylene and concrete. The Field has a total potenial of about 30 TCF in place.
New Alamein City
New Urban Communities Authority
New Alamein City - 2,300 acres
Engineering, construction and procurement of civil and mechanical works for 2,300 acres in the southern sector of the new city of El Alamein for infrastructure. The project consists of establishing infrastructure networks (a sewage network, rainwater drainage network, a feeding network and an irrigation network).
New Administrative capital , cairo
Gas Cool
Network of cooling pipes for the central cooling station in the New Administrative Capital
engineering, construction and procurement of the cooling network in the government district and the financial and business districts in the New Administrative Capital.
meditarranean sea
Damietta container handling company
Rehabilitation of the container berth of Damietta Port
Rehabilitation of the container berth of Damietta Port, with a length of 0,05 mt and a width of 50 m divided into 3 phases each of 350 meters length
Ismailia – Egypt
Engineering Authority for Armed Forces
SUEZ CANAL CORRIDOR DEVELOPMENT PROJECT ISMAILIA TUNNELS
A major Egyptian national development project started on August 2014, with the aim of maximizing the role of Suez Canal region as an integrated industrial and economic logistic hub, which will contribute in boosting Egypt’s economic growth. Petrojet scope of work includes: Engineering, Procurement and Construction for 2 motorway tunnels (twin tunnels) under Suez Canal north of Ismailia Road tunnels length (TBM) : 5.82 Km – Open Cut: 1.3 Km Internal Diameter: 11.4 m External Diameter: 12.6 m Distance between tunnels : 12.6 m Concrete wall thickness: 60 cm tunnel clear height: 5.5 m lanes number : 2 lanes/each lane width: 3.65 m Tunnel Slope: 3.3% Deepest point of the tunnel 53 m from sea level and 70 m from land level In addition to Execution of (4) Ventilation and Inspection Shafts each of: (internal Dia 23 m – Depth:80 m).
new administrative capital
Ministry of housing, utilities & urban communitie
Green River
construction and procurement of buildings, gates, community centers, cinemas, food courts, for the central park of 1the New Administrative Capital on an area of 94 feddans at P-03-A area
6th of october
6th of october authority
Network infrastructure of Dar Misr
engineering, construction and procurement of infrastructure network ( water- sanitary sewege- irrigation -roads) systems with a total length of 8.3 km and asphalt works with a total length of 48000 m2
Alexandria, Egypt
Petrogas
(7) LPG SPHERICAL TANKS
Execution of Civil, Mechanical and Electrical works for (7) storage tanks with a capacity of 2400m3.
Sohag, Egypt
Petrogas
(4) LPG SPHERICAL TANKS
Civil, Mechanical and Electrical works for (2) storage tanks with a capacity of 4000 m3 and (2) storage tanks with a capacity of 2400 m3.
Ain Sokhna – Egypt
Arab Petroleum Pipeline Co. (SUMED)
SUMED EXPANSION OF SUMED STORAGE CAPACITY – PHASE IIII
Construction of 6 Cylindrical Tanks with a total capacity of 175,000 m3, associated with Civil, Piping & Electrical works at Ain Sokhna Terminal
Alexandria
Arab Petroleum Pipeline Co. (SUMED
SUMED EXPANSION OF SUMED STORAGE CAPACITY – PHASE III
Engineering, Procurement (Except Plates) & Construction of (3) Storage Tanks (120,000 m3 / tank) to increase the Storage capacity for SUMED Co. at Sidi Krir.
6th October City
National Defense Council
NATIONAL DEFENSE COUNCIL RESIDENTIAL BUILDINGS
Execution of the third phase of residential and administrative project on 150 feddans. It consists of (72) residential buildings.
Suez – Egypt
Engineering Authority for Armed Forces
NEW SUEZ CANAL – DRY EXCAVATION PHASE
Dry excavation of New Suez Canal at the section 88km to 89km with total volume 11 million m3.
Port Said – Egypt
Suez Canal Container Terminal Co.
SUEZ CANAL CONTAINER TERMINAL (SCCT) PHASE II
Construction of the SCCT onshore works of Phase II on an area of 640,000m2 in addition to expansion works of the facilities and services of Phase I already in operation.
Cairo – Suez Road
.General Authority for Roads, Bridges & Transp
CAIRO – SUEZ ROAD
EPC for Two-way road ( Two-way road of Three-Lane / side (1 Concrete Lane for Heavy Loads) ) including associated construction works with total Length: 20 km and total width: 23,5 m
Benha
.General Authority for Roads, Bridges & Transp
BENHA / ALEXANDRIA (5TH SECTION)
EPC of 5th section of Benha/Alexandria road (Two-way road of four-lanes/sides) including associated construction works of interchanges, Bridges, and crossings with total length: 19 Km and total width: 42 m
Eastern Desert, Egypt
General Authority for Roads, Bridges & Land Transp
ELMENIA – RAS GHAREB ROAD
EPC for Two-way road (Two-way road of Three-Lane / side) including associated construction works with total Length: 55 km and total width: 23,4 m
6th Of October
6th Of October City Authority
6TH OF OCTOBER MAIN CORRIDORS (3RD CORRIDOR)
EPC of 3rd corridor at 6th of october city for the section connecting Zewail university with Wahat road, including associated construction works. It's 2 way road (11 M width) and 2 concrete lanes for heavy loads and 2 bridges
Ain Sokhna – Egypt
PETROJET
JET BEACH RESORT – AIN SOKHNA
Building a Touristic Resort on an Area of 75,420 m2 at Ain Sokhna on the Red Sea Coast.The Resort includes the following: Chalets Area, Hotel Area, Services Area, Landscape, Beach Area
New Cairo – Egypt
Egyptian Sportive Services Co. for Petroleum
PETROLEUM SPORTIVE CITY
Execution of PETROSPORT Sportive City at New Cairo on an area of 45 Feddans including: Outdoor court complex (football, volleyball, basketball, handball, and tennis) Swimming pool • Food court • Stadium
Cairo – Suez Desert Road
Engineering Authority of Egyptian Armed Forces
GARDENIA RESIDENTIAL BUILDINGS
Execution of the concrete structure and finishes to the number of (20) Residential Buildings composed of Six levels include core, shell and finishes for the project buildings and units.
El-Tor -Sinai
Engineering Authority of Egyptian Armed Forces
EL-TOR CITY RESEDINTIAL BUILDINGS
Execution of 30 Residential Buildings composed of (4) levels including core, shell and finishing works.
New Cairo – Egypt
PETROJET
PETROJET NEW ADMIN. BUILDING
Building PETROJET’s New Corporate Head Quarter at New Cairo (5th Settlement) on an area of 17,000 m2 as follows: Main Building: 3,100 m2 West Wing : 775 m2 South Wing : 775 m2 Parking : 9,000 m2
Cairo – Egypt
Petrochemicals Holding Company (ECHEM)
ECHEM NEW ADMIN. BUILDING
Building ECHEM New Admin Building at New Cairo on an area of 3,000 m2 comprising of a basement, ground floor and four typical floors in addition to a 4,200 m2 auditorium and a 2,225 m2 Services Building.
New Cairo
Tharwa Petroleum Company
THARWA PETROLEUM COMPANY NEW ADMIN BUILDING
Building Tharwa New Admin Building at New Cairo on an area of 4,200 m2 consisting of a basement, ground floor and four typical floors.
New Cairo – Egypt
Middle East Oil Tankage and Pipelines Co. (MIDTAP)
MIDTAP NEW ADMIN BUILDING
Building MIDTAP New Admin Building at New Cairo on an area of 4,400 m2 consisting of a basement and four typical floors.
Adabiya Port – Egypt
General Authority for the Suez Canal -SCZone
DEVELOPMENT OF ADABIYA PORT
Construction of Dry Cast Plant inside Al Adabiya port in Suez in two phases on the western coast of Suez Gulf, and it is 17 km away from Suez City.
Port Said
Port Said Port Authority
PORT SAID EAST PORT MAIN ROAD PHASE II (PORT SAID – EGYPT)
Execution of stage II of the Port Said East Port Main Road. The road passes through an area used before for over 20 years as a dumping area for the dredged soil from the Suez Canal, and reached a height of 8m.
Port Said – Egypt
Port Said Port Authority
PORT SAID HARBOR NAVIGATION TOWER
Execution of all construction and finishing works for the navigation complex including a 39m high navigation tower, an administration building on an area of 1200 m2 an underground tank, a power station, gates and fences.
East Port Said
Armed Forces Engineering Authority
BERTH EAST PORTSAID
One of the Suez Canal Corridor Development projects and the East portsaid harbor expansion. Engineering, procurement and construction of a Berth with a total length of 500 M.
مصر
HEAT EXCHANGERS
Material : C.S, S.S, Cu / Ni Alloy Weight : Up to 76 Ton No. of Tubes : 5600 Dimensions : Up to D: 2.7 m L: 14 m Thk: 74 mm
PRESSURE VESSELS
Material : C.S, S.S, Cladded, Alloy & Duplex Material Weight : Up to 330 Ton Pressure : Up to 245 Bar Dimensions : Up to D: 6.6 m L: 42 m Thk: 135 mm
Suez – Egypt
Suez Oil Processing Co.
HEATER 10-H-01
Weight :625 Ton Material :C.S. Internal Diameter : 3 – 5 m Length :35 m Plate Thickness : 45 mm
Port Said & Damietta
UGDC
DE-METHANIZER COLUMN 10-C-01 MEDITERRANEAN NGL DEVELOPMENT PROJECT
Weight : 380 Ton Material : SA 240-304 Internal Diameter : 4.5 m Length : 38 m Plate Thickness : 76 mm
Egypt
General Petroleum Company - GPC Project
DESALINATION PACKAGES
Material : C.S, S.S, and Alloy / Unit Capacity : Up to 5100 m3/day Dimensions : Up to D: 2.7 m L: 14 m Thk: 74 mm
Egypt
Burullus Gas Company
AIR COOLERS
Material : C.S, S.S & Alloy Material Weight : Up to 160 Ton Dimensions: Up to 14 m x 5.5 m x 4.2 m
Damietta – Egypt
UHDE Gmbh
ABSORBER-DESORBER COLUMNS
Weight : 175 Ton Material : SA 516-70 Length : 60.9 m Plate Thickness : 24 mm
Alexandria
GASCO
DE-PROPANIZER TOWER C2C3
Weight : 147 Ton Material : SA 516-70 Internal Diameter : 5 – 3.2 m Length : 35.6 m Plate Thickness : 45-30 mm.
Western Desert, Egypt
Egyptian Natural Gas Co. (GASCO)
Heat Exchangers & Towers (Egypt)
material : C.S, SS Cu/Ni Alloy Wioght: up to 76 ton No. of tubes: 5600 dimensions : up to D: 2.7 m L:14m Thk: 74mm
Damietta, Egypt
Petrobel
LT Separator )
Weight: 565 Tons Material: C. Steel Width: 4.0 m. Length: 21 m. Height: 7.0 m.
Damietta, Egypt
KJT Consortium
Condensate Storage Drum 76-MD-01(Egypt)
Weight: 190 Tons Material: SA 516-70 Internal Diameter: 6.5 m. Length: 30 m. Plate Thickness: 30 mm.
Port Said & Damietta, Egypt
United Gas Derivatives Co.
De-Methanizer Column 10-C-01 (Egypt)
Equipment Details Weight: 380 Tons Material: SA 240-304 Internal Diameter: 4.5 m. Length: 38 m. Plate Thickness: 76 mm.
Petrojet Maadia yard
PETROBEL
ZOHR CONTROL PLATFORM
Fabrication, Load out & sea-fastening of weight : 6000 Ton and Water Depth : 90 m
western desert
Bechtel
West Delta Gas Plants Development
Executing civil, mechanical and electrical works for onshore facilities to connect to five fields in the concession area north of Alexandria and the western Mediterranean with a production capacity of 2.2 billion cubic feet per day. The works include the construction of the Raven gas station with a production capacity of 900 million cubic feet per day and the development of the Burullus gas station to connect to the Giza-Fayum wells to produce 600 million cubic feet, with the aim of increasing gas production to reach 1.6 billion cubic feet of gas and condensate in addition to the Turous Libra field.
Ain Sokhna
Sonker
Sonker Terminal Set up
EPC of civil, mechanical and electrical works for 3 GAS OIL Storage tanks, 2 capacity of 40,000 m3 + 1 capacity of 20,000 m3 and 3 LPG Tanks of capacity 50,000 m3. The works includes of Steel structures, pipes and pipeline works
The National Authority For Tunnels
"Kozzika" Storing Yard & Light Repair Workshop for Cairo Metro Line 1 (G2) Project
Engineering, Procurement and construction for Storing yard and light Repair Workshop: Interface Management Between G1, G2 and G3
suez
petrosalam
PETROSALAM PLATFORM
The project is Consortium between ENPPI And PETROJET Engineering, procurement, fabrication, Pre-commissioning, and Commissioning assistant for Offshore Production Unit with Drilling offshore Jack Up Rig
Alexandria
Abu Qir Petroleum
NAQ PIII ABU-QIR
Fabrication, Load Out and Sea-Fastening of platform with a total Weight of 3210 Ton and Water Depth : 33 M
Red Sea
General Petroleum Company - GPC Project
NAO & HH PLATFORMS
,Fabrication, Procurement and pre-commissioning of offshore platform with total weight 2400 Ton andWater Depth : 23.5 M
Red Sea
Aquaterra
AL-AMAL PLATFORM
Engineering, procurement, fabrication and Load Out and Sea-Fastening of platform with total Weight 1055 Ton Water Depth : 25 M
Petroleum Pipelines Co. PPC
AIN SOKHNA /WADI HAGOOL/AL-HAFAYER CRUDE OIL (30”- 42 KM)
Pipe coating works, and civil, mechanical, and electrical works for Ain Sokhna/Wadi hagool/ Al-Hafayer (30”- 42 km) crude oil Pipeline from station (6) at Ain Sokhna to Al Hafayer valve room
Damietta
GASCO
AL-GAMIL/DAMIETTA (42”-50 KM)
Engineering, Procurement and Construction of 42”-50 km Pipeline including 23 HDD crossings to connect Al-Gamil valve rooms to New Damietta electric station
Port Said
Pharaonic Petroleum Co. (PhPC)
Atoll field Development
Development of ATOLL field that aims to increase production capacity to 380 mmscfd of natural gas. Petrojet scope of work includes Civil, Mechanical, E & I works. it also includes EPC for 2 pressure vessels, rehabilitaion for existing low temperature separator, & fabrication of deep water structures with total weight of 840 tons
New Capital
Egyptian Natural Gas Co. (GASCO)
El Tina-new capital (42”-165 KM)
Construction of 42”-165 km pipeline split into 2 phases; 1st phase is from El-Tina to Abu Sultan with a length of 92 km including 23 HDD crossings. 2nd phase is from Abu Sultan to the Hot Tap of Dahshour P/L at the New Capital with a length of 73 km including 11 HDD crossings.
Nile Delta- Baltim concession area
PETROBEL
Baltim South West - 5873 ton
Fabrication, Pre-commissioning, Load out, Sea Fastening & assistance for offshore commissioning & Start-up of Baltim platform in the Mediterranean sea to connect 6 wells from Nodoco plant to Abo-Madi/Al Qoraa area with onshore pipeline 26’-18km. It’s expected to increase production capacity to 700 mm2/D
Egypt
Bp
BURULLUS FACILITIES FOR GAS PROCESSING PLANT (TAURUS/LIBRA)
Rehabilitation of Burulus facilities for gas processing plant of Taurus/Libra wells which have the capacity of processing 600 MMCFD
Damietta, Egypt
Techint - (Egyptian Methanex Methanol Company)
E-METHANEX METHANOL PLANT
construction of Methanol plant to produce of 1.3 million ton per year in Damietta on the Mediterranean Sea in Egypt.
Port Said – Egypt
UHDE - (Egyptian Propylene & Polypropylene Co. (EP
PROPYLENE & POLYPROPYLENE (PP) COMPLEX
Construction of a petrochemical complex at Port Said, North of Egypt, consisting of a Propylene plant and a Polypropylene plant with respective annual production capacities of 350,000 tons as well as all appurtenant utilities and off-sites, including an air fractionation and refrigerating units, and the required storage tanks. Propylene Plant is based on UHDE’s proprietary STAR Process for Propane dehydrogenation, while Polypropylene Plant is based on Basell’s Spheripol Process.
Abu Qir -Alexandria
Alexfert co./UHDE Gmbh
AMMONIA/UREA FERTILIZER COMPLEX
The establishment of a complete Ammonia/Urea complex including off sites facilities and interconnection to Abu-Qir (1 & 2) with an Ammonia production capacity of 1200 ton/day and Urea Production Capacity of 1925 ton/day
Egypt
Al- Amreya Petroleum Refining Co.(APRC)
DEVELOPMENT OF PHENOL EXTRACTION UNIT
Developing phenol unit extraction to be replaced by N.M.B for saving environment, and increasing production capacity to 283 KT/year
Assuit Oil Refinery Co.(ASORC
ASORC
MAXIMIZING OF GAS RECOVERY UNIT AT ASSUIT REFINERY (VRU)
Maximizing the efficiency of Gas Recovery Unit to increase LPG production to 400 KT/year
Port Said / Damietta - Egypt
United Gas Derivatives Company (UGDC) (JV formed o
MEDITERRANEAN NGL DEVELOPMENT
A natural gas liquids extraction facility relying on natural gas produced from North East Mediterranean fields (Al Temsah, Port Fouad, Habi, and Akhen) to extract natural gas derivatives. It is designed to process 1100 MMCFD to produce 300 thousand tons of LPG for the local market, 280 thousand tons of propane for export, and million barrel per year of condensates, and to supply the olefin complex in the future with Ethane/Propane mixture by 400 thousand tons per year.
BED 3 Plant – Western Desert
Enppi - (BAPETCO / SHELL)
ASSIL & KARAM GAS DEVELOPMENT
Project aims at increasing the gas production at BED-3 up to 200 MMSCFD by bringing gas from newly discovered wells at Karam (5 Wells) and Assil (2 Wells) . Development includes a new CO2 Removal Plant (CRP) to remove high CO2 content prior to further processing the gas at the existing BED-3 facilities to meet the export CO2 specifications
Alex
Technip
MIDOR REFINERY
Development of a modern grassroots refinery to expand the production capacity from 100,000 BPSD to 160,000 BPSD whilst maximizing distillate production. Petrojet scope of work includes Construction, Precommissioning, & Commissioning assistance.
Idku
Bechtel - (Egyptian Liquefied Natural Gas Co. (ELN
EGYPTIAN LIQUEFIED NATURAL GAS (LNG) PROJECT
A two – train Liquefied Natural Gas (LNG) plant each with a capacity of approximately 3.6 MT/Y on approximately 165 hectares of land located 3 km from the town of Idku and 40 km East of Alexandria on the Egyptian Mediterranean coast. Technology utilized is the Phillips Optimized Cascade liquefaction technology. The Facility includes 2 Cryogenic Tanks each with a capacity of 140,000 m3, Common Facilities (including Power Generation, Fire Water Systems and Control Building) and Marine Facilities.
Western Desert - Egypt
Petrofac - Khalda Petroleum Co.
SALAM GAS TRAINS (T3 & T4) PROJECT
The target of the project is to increase the productivity of El Salam gas station to 410 MMCFD by doubling the processing units to 4 units then transporting the processed gas by el Obayed /el Amerya pipeline
Alexandria, Egypt
ELAB
LINEAR ALKYL BENZENE (LAB) PROJECT
Development of a Linear Alkyl Benzene Plant in Alexandria, North of Egypt with a production capacity of 100,000 Tons/Year. Plant consists of Process Unit–Utilities – Storage Facilities – Service Buildings. EPC Contract is performed by Consortium of (PETROJET – ENPPI – GS), where Engineering & Procurement are performed by ENPPI & GS while PETROJET scope is the Construction and Fabrication works.
Alexandria – Egypt
Egyptian Natural Gas Company
ETHANE/PROPANE (C2 / C3) MAXIMIZATION
A project aiming at increasing the production of the C2 – C3 by introducing modification in both Amereya LPG recovery plant and the WDGC in addition to the installation of new facilities at both plants. Turbo expander technology is utilized in both plants to maximize C2 and c3 production. The projects scope of work also covers modifications to upgrade the existing process facilities and utilities at both plants.
Alexandria - Egypt
JV (TOYO/ ENPPI
NEW PETROCHEMICAL COMPLEX
Construction of a 460,000 ton/year ethylene plant and a 20,000 ton/year butadiene extraction plant as part of Ethydco’s petrochemical complex. The plant is built based on the most advanced ethylene technology of Lummus Technology of the U.S.. Petrojet scope of work: full construction in addition to fabrication of process equipment
From Nooros to Abu MAdi to El Gamil - Egypt
PETROBEL
NOOROS-ABU MADI-EL GAMIL PIPELINE
Execution of a Gas Trunk Pipeline with total length of 126 km from Nooros to El Gamil passing by Abu Madi Plant in order to increase the extraction of butane and gas supply to UGDC Company’s plant for increasing Propane production. 1st Pipeline with Diameter 24” and Length 35 km from Nooros Fields Area to Abu Madi Plant. 2nd Pipeline With Diameter 32” and Length 91 km from Abu Madi Plant to El Gamil Plant. Scope of work includes: Polyethylene and Concrete Coating for Pipeline Pipes. Permitting/Land compensation. Backfilling of Manzala Lake for about 2.2 Million m3 of soil. 7 new Valve rooms (1 inside Manzala lake) Receiving facilities in Abu Madi and El Gamil plant About 57 HDD Crossings and 50 Open Cut Crossings. Project Challenges El Manzala Lake Backfilling: 200.000 m3 (35 Km Length). 55 HDD Crossings ( River Nile, El Salam Canal, Fish Farms, Railway, Highways, …etc)
Ain-Sokhna
El Nasr Co. for intermediate chemicals
PHOSPHATE FERTILIZER COMPLEX - PACKAGE 2
Joint Venture ( Petrojet- Ballestra ) EPC of phosphate fertilizer complex package 2. The complex includes 5 plants for the production of phosphate, compound fertilizers, and pure phosphoric acid with production capacity of 1.3 million ton/year
Haikestep - cairo – Ismailia Desert Road – Egypt
Engineering Authority of Egyptian Armed Forces
FUTURE CITY RESIDENTIAL BUILDINGS
Execution of 10 residential buildings composed of (6) levels including core, shell, and finishing works within the housing project for the members of the Armed Forces in Future City.
Egypt
SKID MOUNTED PACKAGES
Material : C.S, S.S, Cladded and Duplex Weight : Up to 220 Ton Dimensions : Up to 21m x 6 m x 6.5 m